DALLAS ISD - ORG 060 BOUDE STOREY MS
Status
Bidding Closed
Prebid Date | 8/5/24 11:00am |
Bid Date | 9/4/24 2:00pm |
Company & Contacts
Location
3000 MARYLAND AVE, DALLAS, TEXAS 75216
All digital files included with purchase of complete printed set via file transfer. Specs separated by section and plans by sheet names.
Half Size Available upon Request
NOTICE: INVITATION TO BID
Scope of Work. The Work consists of:
ORG 060 – Boude Storey Middle School Renovations -
Project consists of the following:
1. Provide security updates including cameras, card access readers and door contacts
2. Provide secure front vestibule
3. Replace service entrance switchgear
4. Replace fire alarm system
5. Provide exterior lighting controls
6. Replace exterior lights with LED lights
7. Replace lighting controls
8. Provide/replace IDF/MDF air conditioning
9. Remove and replace ceiling with new acoustical lay in ceiling tiles and grids (select areas only)
10. Paint select previously painted interior surfaces.
11. Replace exterior doors
12. Provide new wayfinding site signage
13. Provide new marquee sign located at front entry
14. Provide new room graphics and way finding signage
15. Provide caulk joints as all previous exterior surfaces and wash brick.
16. Replace spray foam roof system.
17. Replace sidewalk and variouslocations
18. Remove and replace service yard drive
19. Provide interior lighting controls
20. Replace interior lights with LED lighting
21. Install / provide air conditioning at boys gym
22. Grease trap and slab
23. Mechanical / HVAC improvements including new split system AC units, roof top units, condenser
control pumps, chiller, boiler and exhaust fans.
24. Plumbing improvements including washer/dryer connections, water heaters, cold & hot water
piping, dilution tank, hose bib replacements, grease and waste pipingreplacement
BUDGET: Total Estimated Construction Budget (CCL + Allowances) for CSP 207457 $6,446,915.86
PRE-BID & LOCATION:
A pre-proposal meeting will be held via Zoom on 08/05/2024 at 10AM for all interested parties. This
meeting is not mandatory, but information discussed will be extremely helpful in preparation of the
proposal.
Join Zoom Meeting
https://dallasisd.zoom.us/j/89774093145?pwd=7ynvbVvxXPm0IUXJkHKKJbXuYnR1aO.1
Meeting ID: 897 7409 3145
Passcode: 937711
All general contractors and sub-contractors are encouraged to attend this meeting. Contractors will meet A/E(s)
and PM at each school to start site tours. The first site tour will take place immediately following the pre-proposal
conference. The following is the schedule for all site tours:
Boude Storey MS - Renovations, August 5, 2024 at 2:00pm 3000 Maryland Ave. Dallas, Texas 75216
BID-DATE & LOCATION:
All Construction Services procurements must be physically delivered to the Construction Services office, at the
Linus D. Wright Dallas ISD Administration Building 9400 North Central Expressway, Suite 800 Dallas, TX 75231.
(Call 972.925.7200 for directions). Delivery to other locations will result in rejection of a CSP.
Completed CSP Package Part 1-A, 1-B and 1-C are due on Wednesday, 9/4/24 2:00PM (local time).
Completed CSP Package Part 2 is due on Thursday, 9/5/24 3:00PM (local time).
Any materials received after the respective closing dates / times will not be considered.
The District will open and read the names of the proposers and prices submitted in responsive CSPs beginning at
3:00 P.M. local time upon submittal of Part 2 of the Package, at Dallas ISD Construction Services, Linus D. Wright
Dallas ISD Administration Building 9400 North Central Expressway, Suite 800 Dallas, TX 75231.
Join Zoom Meeting
https://dallasisd.zoom.us/j/88559158185?pwd=GV59H2mWyf8uHxxstq7SYmf1NO4bCu.1
Meeting ID: 885 5915 8185
Passcode: 990505
No further information will be officially released until after the date the Agenda is publicized for the Board of
Trustees briefing.
The right is reserved to reject any or all bids, proposals, CSPs or statements of qualification and to waive
technicalities.
The Dallas Independent School District is committed to the ideals of equal opportunity in all its business endeavors.
The Dallas Independent School District’s Construction Services projects have a 30% Minority and Women-Owned
Business Enterprise (M/WBE) construction goal.
RUN TWO TIMES ONLY AS FOLLOWS:
07/21/24 and 07/28/2024
OWNER
Dallas ISD Procurement Services c/o Bond/Construction Services
Linus D. Wright Dallas ISD Administration Building
9400 North Central Expressway, Suite 800
Dallas, TX 75231
OWNER’S PROJECT MANAGER (PM):
McKissack & McKissack – Robert Spicer, Project Manager
Dallas Independent School District
Construction Services
Linus D. Wright Dallas ISD Administration Building
9400 N. Central Expressway Suite 800
Dallas, TX 75231
Phone: 817-308-2916
E-mail: c113808@dallasisd.org mailto:KSimon@dallasisd.org
ARCHITECT/ENGINEER FIRM (A/E)
PGAL Inc
14135 Midway Rd Suite G-200, Addison, TX 75001
Main Contact: Tim Konganda
Phone: 972-871-2225
Fax: N/A
Email: tkonganda@pgal.com
BID METHOD:
Competitive Sealed Proposals